5 x 33KV with Fibre Optic

London

North London, a two-customer requirement of 5 x 33KV circuits with Fibre Optic Protections, in preparation for a new data centre and to export power from a Generation Site.

Cable Installations

Location
London
Year Started
August 2018
Year Completed
April 2020

5 x 33KV with Fibre Optic Protections

The works consisted of a fully ducted route for both clients through main arterial roads into London. To reduce trench width a double stack of ducts was required.

The route crossed waterways, major road intersections and within Type 0 road constructions, bespoke cable lengths were also required to enable reduction of Joint Bay constructions, approximately 53,000mts of 33KV and Fibre cable were installed.

24hr working was required to reduce programme disruption.

This project received commendations from both Haringey and Enfield councils for how well it was carried out and within timescales.

  • 53,000 Metres of 33KV & Fibre Cable Installed
  • 24 hour works
  • Works Completed within timescale

Project Highlights

Fully Ducted Route: Implemented a fully ducted route for two clients along main arterial roads into London, optimising infrastructure efficiency, Double Stack Ducts: Utilised a double stack of ducts to reduce trench width, enhancing installation efficiency and minimising environmental impact, Challenging Crossings: Successfully crossed waterways, major road intersections, and Type 0 road constructions, requiring bespoke cable lengths to minimise Joint Bay constructions, Installation Metrics: Installed approximately 53,000 metres of 33KV and Fibre cable, bolstering connectivity and network capacity, 24-Hour Operations: Implemented round-the-clock working schedules to minimise programme disruption and ensure timely project completion & Council Commendations: Received accolades from Haringey and Enfield councils for exemplary execution and adherence to project timelines.

Enhanced High-Voltage Infrastructure in Urban London

With a commitment to operational excellence, including 24-hour working to minimise disruption, we deliver projects within stringent timelines while earning commendations from local authorities for our exceptional performance. Partner with us to elevate your high-voltage infrastructure with precision and efficiency.

Contact us today to see how we can help your next project.

Ground Utilities

Follow us on Instagram

Follow us